DU Bingbing, WANG Di, QUE Zixiong, et al. Research on quality control and key processes of the Lusail Stadium project[J]. 2020,50(3):120-125. DOI: 10.7512/j.issn.1001-2303.2020.03.22.
For the Lusail Stadium project,this article states the QA/QC quality management of this project at the time of factory production,we developed a project inspection and testing plan ITP,which also described specific requirements of personnel qualification,material management,project inspection,etc. At the same time,the typical column foot node is taken as an example to carry out key process research. Based on the research of manufacturing technology,small angle welding technology,large section end milling and wide-angle groove open technology,etc. We can achieve the quality control requirements of this project component.