WANG Qingtian, LUO Ying, YU Zhiwei, et al. Broken fault analysis and improvement for bolts in reactor vessel internals in Yangjiang nuclear power plant unit 2[J]. 2018,48(2):82-87.
WANG Qingtian, LUO Ying, YU Zhiwei, et al. Broken fault analysis and improvement for bolts in reactor vessel internals in Yangjiang nuclear power plant unit 2[J]. 2018,48(2):82-87.DOI:
The bolt broken fault happened in bottom mounted instrumentation and secondary core support assembly in RVI of Yangjiang NPP Unit 2 is introduced. And the damage caused by this broken fault to primary circuit equipment is also introduced. The reasons of bolts broken fault are analyzed from design,manufacture,installation and operation,and some improvement measures are put forward. These measures can be significant reference for site installation and welding of M310 reactor nuclear power plant and third generation nuclear power plant,such as ACP1000,EPR and AP1000 and so on.
关键词
阳江核电厂堆内构件螺栓断裂原因分析
Keywords
Yangjiang nuclear power plantRVIboltsbroken faultreason analysis