A certain transformer support is made of Q235 B steel tube. In order to achieve the requirements of preventing eddy current phenomenon and special performance,it is necessary to use red copper for filling and welding. The welding of steel and copper is difficult,welded joint is prone to hot crack and porosity defect. By analyzing their weldabilities and welding process problems,it is decided to adopt the manual tungsten argon arc welding(GTAW). By making a reasonable welding procedure,including the controls of welding materials control,welding procedure measures,welding parameters,welding operations,the welded joint obtained meets the requirements of quality and design.
关键词
构支架手工钨极氩弧焊焊接工艺
Keywords
structural supportGTAWwelding procedure
references
Alert me when the article has been cited
提交
相关文章
暂无数据
相关作者
暂无数据
相关机构
Qinghai Oilfield Branch Company of China Petroleum,Dunhuang
College of Metallurgical and Materials Engineer,Chongqing University of Science and Technology