An overview and cause analysis of the typical defects found in manufacturing and on-site inspection of tube to tube sheet sealing welding of condenser for CPR1000 nuclear power units are provided. And the technical improvement measures concerning cleanliness control
welding parameter optimization
welding parameter adjustment test plate application
weld formation and depth control are proposed
and good results are obtained in practical application
which provides reference experience for the improvement of the sealing welding tech-nology of nuclear power condenser tube sheet.