对VVER压水堆核电站由中俄转换设计、施工过程中典型的焊接技术问题进行分析
提出了解决俄罗斯供材料、中国供材料及第三国材料及母材分类不确定无法确定焊接工艺材料进行评定问题的流程、措施
对俄罗斯供设备缺陷及材料焊接过程中缺陷的处理提出了解决意见和经验反馈
对缺少焊接工艺及焊工资质的困难的施工技术优化也提出了整改意见
有效落实整改方法可促进中俄技术转换
可促进工程建设进度。
This paper analyzes the typical welding technical problems in the design and construction process of VVER PWR nuclear power plant from China to Russia
and puts forward the process and measures to solve the problems of uncertain classification of materials supplied by Russia
materials supplied by China
materials and base metals from the third country
which cannot determine the welding process materials for evaluation. The process and measures for assessing problems
providing solutions and experience feedback for the treatment of defects in equipment and materials in the welding process in Russia
and suggestions for rectification of difficult construction techniques that lack welding processes and welding qualifications
and effectively implemented rectification methods can promote Sino-Russian technology conversion and the progress of project construction.