Accumulator middle tread run is welded by submerged arc welding for HL1000 nuclear plant in China. The welding is performed with the combination of sphere positioner and narrow gap submerged arc welding machine
and the automation welding of sphere arc-shaped curve welds of ACC middle tread run is realized. The influence factors for welding quality are discussed from material
welding current
voltage
rolling speed of the positioner and weld groove type. The measures are adopted from the design of groove
the selection of welding methods
the control of the size of middle tread run
the control of assembly size
the control of welding process
the welding sequence and so on
and the technology planning is done in all directions. Finally
the welding of three accumulator middle tread runs for HL1000 nuclear plant is accomplished.