Simulation of Multi-wire Longitudinal Submerged Arc Welding of X90M Pipeline Steel
- Vol. 52, Issue 3, Pages: 46-52(2022)
Received:19 July 2021,
Revised:2021-10-26,
Published:30 March 2022
DOI: 10.7512/j.issn.1001-2303.2022.03.06
移动端阅览

Received:19 July 2021,
Revised:2021-10-26,
Published:30 March 2022
移动端阅览
相关文章
相关作者
相关机构