Taking the spent fuel pool of one domestic nuclear power station currently under construction for example
the application of automatic argon tungsten-arc welding process to the stainless steel liner of spent fuel pool has been studied. By verification of type selection
groove design and welding parameters of welding materials
and consideration of actual application condition on site
it shows that the performance of welding joint can meet the requirements of nuclear power design standard
and this technology can effectively improve welding quality and efficiency compared with traditional manual argon arc welding method.