The full-scale simulation experiment of the main pipeline installation is the most important work before the main installation and welding of the main pipeline of the nuclear power plant
and the backing welding is the first process of welding. The quality is the basis for ensuring the weld molding and performance of the main pipeline. As a consequence
controlling the quality of the backing welding is the key to the success of the full-scale simulation experiment of the main pipeline. This paper is mainly aimed at the burnthrough
concave and non-welding defects occurred in the three-weld backing welding process of the main pipe of a nuclear power plant. It is analyzed from five aspects:human
machine
material
method and ring. And combined with the test verification after the cause analysis
find out the shortcomings in the simulation of the trial
make clear the quality control measures of the main pipe backing welding and provide some guidance for the follow-up of the main pipeline work.