Feasibility study on application of narrow gap argon arc (N-TIG) welding technology in nuclear power plant VVER composite steel main pipeline
Vol. 49, Issue 4, Pages: 59-66(2019)
Published:2019
DOI:
稿件说明:
移动端阅览
DOI:
ZHENG Qianqian, ZHENG Rishui, LUO Chao, et al. Feasibility study on application of narrow gap argon arc (N-TIG) welding technology in nuclear power plant VVER composite steel main pipeline[J]. Eletric Welding Machine2019, 49(4): 59-66.DOI:
Feasibility study on application of narrow gap argon arc (N-TIG) welding technology in nuclear power plant VVER composite steel main pipeline
According to the welding of the main circuit pipelines of nuclear power plants such as M310
CPR1000 and AP1000 in China
automatic welding technology has been successively implemented
which has significant effects in improving construction efficiency and quality. Combined with the characteristics of Russian VVER stacked main pipeline composite steel material
the present situation of automatic welding of main pipeline of nuclear island in China is fully discussed. It is of great significance to develop the construction technology of composite steel automatic welding for main pipeline with Chinese characteristics
utilize foreign resources and promote the feasibility study of international cooperation.